Construction Project Scheduling Manager-Jacksonville, FL

AECOM

Construction Project Scheduling Manager-Jacksonville, FL

Jacksonville, FL
Full Time
Paid
  • Responsibilities

    Job Description

    AECOM Hunt has an exciting opportunity for a Construction Scheduling Manager for our exciting stadium project in Jacksonville, FL.

    • Skilled in the development of commercial strategies. Capable of participating in negotiations.
    • Requires a demonstrated ability to effectively lead the project controls function on a large/complex project.
    • Leadership
    • Documents employee performance issues and is instrumental in resolution.
    • Organizational Management
    • Conducts root cause analysis.
    • Drafts comprehensive project procedures.
    • Possesses proven knowledge of scope control and change management.
    • Oversees the production and maintenance of accurate project schedules.
    • Expert understanding of schedule resource loading and leveling.
    • Assists the Project Manager in budgeting and managing incentive programs.
    • Holds an expert understanding of schedule, critical path analysis, resource loading and leveling.
    • Establishes and maintains client relationships.
    • Has the ability to review and analyze project program and oversee the production of accurate progress/performance reports.
    • Able to review and assess (as required) raw data that comes from project automated systems.
    • Serves as a key participant in client and/or subcontractor negotiations.
    • Participates in staffing decisions for projects.
    • Ensures that a tracking database is developed and maintained to cross check subcontractor funding is aligned with work authorization and expenditures.
    • Involved in tracking system to ensure that Project Management team is fully aware of detailed change order status.

    About Construction Management – AECOM Hunt

    AECOM Hunt is a national construction manager and design-builder specializing in commercial, aviation, sports (arenas and stadiums), higher education, convention center, residential and hospitality projects. Founded on a reputation of professionalism and quality, with the financial backing of AECOM, we are one of country’s premier builders.

  • Qualifications

    Qualifications

    Minimum Requirements:

    • BA/BS and 8 years of relevant construction scheduling experience or demonstrated equivalency of experience and/or education.
    • Construction Project Scheduling.

    Preferred Requirements:

    • 8-10 years of experience in construction scheduling from a large GC.
    • Experience in management of construction related scheduling (not EPC).
    • Primavera P6 experience.
    • Experience working on mega-construction projects as a Scheduler.
    • Experience analyzing schedule variances.
    • Proficiency in Microsoft Office (Word, Excel, Outlook, Teams, etc.
    • Experience in construction scheduling of large mega-structures:
      • stadium/sports complex
      • high rise
      • airport

    Additional Information

    • This position does not include sponsorship for United States work authorization now or in the future.
    • Qualified applicants who are offered a position must pass a pre-employment substance abuse test.
    • Relocation may be available for this position.

    About AECOM

    AECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, well-being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan.

    AECOM is the world’s trusted infrastructure consulting firm, delivering professional services throughout the project lifecycle – from advisory, planning, design and engineering to program and construction management. On projects spanning transportation, buildings, water, new energy and the environment, our public- and private-sector clients trust us to solve their most complex challenges. Our teams are driven by a common purpose to deliver a better world through our unrivaled technical and digital expertise, a culture of equity, diversity and inclusion, and a commitment to environmental, social and governance priorities. AECOM is a Fortune 500 firm and its Professional Services business had revenue of $14.4 billion in fiscal year 2023. See how we are delivering sustainable legacies for generations to come at aecom.com and @AECOM.

    Freedom to Grow in a World of Opportunity

    You will have the flexibility you need to do your best work with hybrid work options. Whether you’re working from an AECOM office, remote location or at a client site, you will be working in a dynamic environment where your integrity, entrepreneurial spirit and pioneering mindset are championed.

    You will help us foster a safe and respectful workplace, where we invite everyone to bring their whole selves to work using their unique talents, backgrounds and expertise to create transformational outcomes for our clients.

    AECOM provides a wide array of compensation, benefits and well-being programs to meet the diverse needs of our employees and their families. We’re the world’s trusted global infrastructure firm, and we’re in this together – your growth and success are ours too.

    Join us, and you’ll get all the benefits of being a part of a global, publicly traded firm – access to industry-leading technology and thinking and transformational work with big impact and work flexibility. As an Equal Opportunity Employer, we believe in each person’s potential, and we’ll help you reach yours.

    All your information will be kept confidential according to EEO guidelines.